Sunday, June 23, 2013

Out with the old...

 The "kitchen" had plywood installed over the caboose floor and then linoleum was installed on top of that.  We are scraping off the linoleum, unscrewing the plywood and taking it out.  It is time consuming but the floor underneath is original and probably in the best shape compared to the rest of the original floor.
We are taking out the old walls and insulation.  Then we will get rid of the rust, patch holes in the body and start to refurbish.
The tub will have to come out.  Someone cut a hole in the floor to install it...
Most of the critters are gone.  We have taken out the appliances and saving the pipes, handles, lights, and train artifacts to reinstall them later.

We are also battling beavers... they build a dam...  we tear it down.  Hoping they will move on.

No comments:

Post a Comment